Construction of Herman Miller’s New HQ and distribution centre began in 2014, being the biggest single investment in the town, and creating 200 jobs in the local area.
The 170,000 sq metre warehouse project required Timber Sound Absorption panels to be fitted to the walls of the office area, meeting rooms, restaurant and general circulation space. The acoustic wall panels were specified for innovative design and high sound absorption acoustic performance.